saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 74 > < Initial Inspection and Diagnostic Overview|Page 72
Page 3
background image

1. Make sure the component or lead being tested is not carrying a current (e.g. by removing the associated fuse).
2. Set the multimeter to resistance measurement and connect it across the component/lead being tested.
3. Move the wiring harness in question while observing the ohmmeter.

The resistance of the wiring harness should normally be less than 1 ohm. A specified value applies to components.

Checking for short circuits to ground

Initial Inspection and Diagnostic Overview|Page 74 > < Initial Inspection and Diagnostic Overview|Page 72