saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Front Cover Removal|Page 2674
Page 6
background image

^

Bracket to intake manifold

^

Torque: 30 Nm (22 ft. lbs.)

^

Bracket to block

^

Torque: 30 Nm (22 ft. lbs.)

23. Install deaeration line fittings and clamps:

^

Deaeration line fitting to cylinder head and nut to fitting.

^

Torque: 9 Nm (80 in. lbs.)

^

Deaeration line to rear lift bracket.

^

Torque: 11 Nm (97 in. lbs.)

NOTICE: Replace plastic fuel line retainers whenever the fuel supply or return line is disconnected at the fuel rail. Install the new retainer into the
female cavity of the connection. Care must be taken to assure that the locking tab is centered in the window of the female cavity. Firmly press the
female and male ends together until a click is heard, then pull back to confirm engagement. Pinched, kinked, or damaged fuel lines must be
replaced.

IMPORTANT: The service retainers are different in color from the original equipment retainers. The service fuel feed line retainers are clear in
color.

24. Lubricate with clean engine oil the male fuel feed line and the male fuel return line connections. Attach the fuel feed line and pull back to confirm

engagement. Attach the fuel return line and pull back to confirm engagement.

25. Install fuel line clip to bracket.

^

Torque: 6 Nm (53 in. lbs.)

26. Install air cleaner assembly and attach the fresh air hose. Attach air inlet tube.
27. Install oil pan drain plug and fill engine with new oil.

^

Torque: 37 Nm (27 ft. lbs.)

28. Install cylinder coolant block drain plug and close radiator drain.

^

Torque: 30 Nm (22 ft. lbs.)

29. Fill with coolant. Use only DEX-COOL non-phosphate antifreeze and clean water.

IMPORTANT: Vehicle must be level when filling with coolant.

30. Connect the battery terminals.

^

Torque: 17 Nm (151 in. lbs.)

31. Prime fuel system.

a. Cycle ignition on for five seconds and then off for ten seconds.
b. Repeat step 27 a twice.
c. Crank engine until it starts (maximum starter motor cranking time is 20 seconds)
d. If engine does not start, repeat steps 27 a-c

32. Start engine and check for leaks.

33. Fill the cooling system surge tank to the FULL, COLD line and check for leaks after the engine has been road tested.

IMPORTANT: Allow the engine to idle for three to five minutes. If lifters are noisy or cylinders are mix-firing, warm the engine up at a low rpm
(less than 2,000). After the coolant temperature has reached approximately 85° C (185° F), cycle engine rpm from idle to 3,000 for approximately
10 minutes or drive the vehicle five minutes to purge the air. If the air cannot be purged, the faulty lifter(s) will have to be replaced.

34. Perform three mile road test and cycle engine under various loads.
35. Check for coolant and oil levels. Verify there are no leaks.

Tune-up and Engine Performance Checks > < Front Cover Removal|Page 2674