SW2 L4-1.9L DOHC VIN 7 (1997)
21. Install dimmer switch wiring harness to instrument panel reinforcement.
22. Install instrument cluster.
23. Install and torque screws.
Torque: 3 N.m (26 in-lbs)
24. Connect electrical connectors to instrument cluster.
25. Install Connector Position Assurance (CPA).
26. Connect electrical connector to dimmer switch.
27. Install instrument cluster trim bezel. Push in at clip locations.
28. Install push pin fasteners.