scion Workshop Repair Guides

Scion Workshop Service and Repair Manuals

Timing Chain|Testing and Inspection|Page 1453 > < Timing Chain|Testing and Inspection|Page 1451
Page 4
background image

7. REMOVE CYLINDER HEAD COVER

a) Remove the 9 bolts, 2 nuts and cylinder head cover.

8. REMOVE GENERATOR V BELT
9. REMOVE GENERATOR

10. REMOVE ENGINE UNDER COVER RH
11. DRAIN ENGINE OIL
12. DRAIN ENGINE COOLANT
13. REMOVE VANE PUMP V BELT
14. REMOVE WATER PUMP PULLEY
15. REMOVE WATER PUMP

16. REMOVE CRANKSHAFT PULLEY

a) Set the No. 1 cylinder to the TDC/compression.

1) Turn the crankshaft pulley until its timing notch and the timing mark 0 of the chain cover are aligned.
2) Check that both timing marks on the camshaft timing sprocket and the camshaft timing gear are facing upward as shown in the illustration.

If not, turn the crankshaft 1 complete revolution (360°) and align the marks as above.

b) Using SST, remove the pulley bolt.

SST 09213-58012 (91111-50845), 09330-00021
If necessary, remove the pulley with SST.
SST 09950-50013 (09951-05010, 09952-05010, 09953-05020, 09954-05021)

Timing Chain|Testing and Inspection|Page 1453 > < Timing Chain|Testing and Inspection|Page 1451