xA L4-1.5L (1NZ-FE) (2006)
c. Remove the 3 bolts and canister.
INSTALLATION
1. INSTALL CANISTER
a. Install the canister with the 3 bolts.
Torque: 19 N.m (194 kgf.cm, 14 ft.lbf)
b. Connect the 2 tubes and hose.
c. Remove the 3 bolts and canister.
INSTALLATION
1. INSTALL CANISTER
a. Install the canister with the 3 bolts.
Torque: 19 N.m (194 kgf.cm, 14 ft.lbf)
b. Connect the 2 tubes and hose.