xA L4-1.5L (1NZ-FE) (2006)
a. Apply Primer G to the glass where the spacers will be installed.
HINT: If primer G is applied to an area that is not specified, wipe off the primer with white gasoline before it dries.
b. Install 4 new spacers.
NOTE:
-
Allow the primer to dry for 3 minutes or more.
-
Throw away any leftover primer.
-
Do not apply too much primer.
3. INSTALL BACK DOOR WINDOW MOULDING
a. Apply Primer G to the installation part of the window moulding.
NOTE:
-
Allow the primer to dry for 3 minutes or more.
-
Throw away any leftover primer.
-
Do not apply too much primer.
b. Install the new moulding LH and RH as shown in the illustration.