xB L4-1.5L (1NZ-FE) (2004)
a. Install the pulley to the rotor shaft by tightening the pulley nut by hand.
b. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
Torque: 39 Nm (400 kgf.cm, 29 ft.lbf)
NOTE: Check that SST is secured to the pulley shaft.
c. Clamp SST 2 in a vise.
d. Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.
e. Tighten the pulley nut, turn SST 1-A to the direction shown in the illustration.
Torque: 111 Nm (1,125 kgf.cm, 81 ft.lbf)
f.
Remove the generator from SST 2.
