xD L4-1.8L (2ZR-FE) (2008)
(a) Engage the 4 claws and install the air duct.
9. INSTALL INSTRUMENT PANEL BRACE SUB-ASSEMBLY
(a) Install the instrument panel brace with the bolt, screw and nut.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(b) Install the PTC heater wire with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Engage the 3 clamps.
10. INSTALL REAR NO. 2 AIR DUCT
(a) Engage the 4 claws and install the air duct.
11. INSTALL REAR NO. 1 AIR DUCT