xD L4-1.8L (2ZR-FE) (2008)
Shift Cable: Service and Repair
Installation
C50 MANUAL TRANSAXLE: TRANSMISSION CONTROL CABLE: INSTALLATION
INSTALLATION
1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Install the control cable with the 3 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the control cable assembly onto the control cable bracket with 2 new clips.
(c) Connect the control cable assembly and install the 2 washers and 2 clips.
(d) Install the control cable assembly onto the shift lever retainer.
NOTE:
-
Install the cable with the protruding portion of the cable outer facing upward.
-
After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.
(e) Connect the control shift cable to the shift lever.