Actioning cable: mounting and adjusting
- Make
- SEAT
- Model
- Inca
- Year
- 1995–2003
- Section
- Heating, air conditioning › Actioning cable: mounting and adjusting
HeatingActioning cable: mounting and adjusting
Actioning cable: mounting and adjusting
Note!
- First mount the actioning cables in the dismounted control unit and then adjust and fix the cables on the levers
- Covers of actioning cables are differently coloured
- Check actioning cables before mounting and substitute tight moving cables or those that present imperfections
- On turning controls all flaps should audibly reach max. position

- 1 Actioning cable for the footwell zone/ deicer flap
From the control knob of air distributor to the footwell zone flap/deicer
Identification of the cover of the actioning cable: Left hand drive: black Right hand drive: black
Adjusting the actioning cable in the footwell zone/deicer flap Fig. “Actioning cable: mounting and adjusting” - 2 Actioning cable for central flap
Of the air distributor control knob to the central flap
Identification of the cover of the actioning cable: Left hand drive: yellow Right hand drive: grey
Adjust the actioning cable in central flap Fig. “Actioning cable: mounting and adjusting” - 3 Actioning cable for temperature flap
From the temperature control knob to the temperature flap
Identification of the cover of the actioning cable: Left hand drive: blue Right hand drive: white
Adjust the actioning cable in temperature flap Fig. “Actioning cable: mounting and adjusting”

Parts & tools for this job For 1995 SEAT Inca
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: SEAT Inca 1995 cabin filter
As an Amazon Associate we earn from qualifying purchases.