Installation is done in reverse order of the removal operations; note the following: |
–
| Position spacer block on side window and remove 10 minutes after installing side window. |
–
| Tighten Torx screws to 8 Nm. |
–
| Attach new strip of adhesive tape to exterior panelling and arrest panelling on B-pillar. |
|
|
|