Leon Mk1
Actioning cable: mounting and adjusting |
Note!
t | First mount the actioning cables in the dismounted control unit and then adjust and fix the cables on the levers |
t | Covers of actioning cables are differently coloured |
t | Check actioning cables before mounting and substitute tight moving cables or those that present imperfections |
t | On turning controls all flaps should audibly reach max. position |
1 - | Actioning cable for the footwell zone/ deicer flap |
q | From the control knob of air distributor to the footwell zone flap/deicer |
q | Identification of the cover of the actioning cable: Left hand drive: black Right hand drive: black |
q | Adjusting the actioning cable in the footwell zone/deicer flap → Fig. |
2 - | Actioning cable for central flap |
q | Of the air distributor control knob to the central flap |
q | Identification of the cover of the actioning cable: Left hand drive: yellow Right hand drive: grey |
q | Adjust the actioning cable in central flap → Fig. |
3 - | Actioning cable for temperature flap |
q | From the temperature control knob to the temperature flap |
q | Identification of the cover of the actioning cable: Left hand drive: blue Right hand drive: white |
q | Adjust the actioning cable in temperature flap → Fig. |
|