Installation is carried out in reverse sequence; note the following: |
–
| Check clutch release bearing for wear and renew if necessary. |
–
| Lightly grease clutch release bearing, release bearing guide sleeve and splines on input shaft with G 000 100. |
–
| Check whether dowel sleeves for centring the engine/gearbox assembly are fitted in the cylinder block; install if necessary. |
–
| Align the engine using a shaking movement so that the supports are not under any tension. |
Note Specified torques for assembly mountings → Chapter. |
Vehicles with air conditioner |
All other vehicles continued |
–
| Connecting vehicle diagnosis tester. |
–
| Finish the vehicle system test so that any fault entries stored during assembly can be erased automatically. |
Note safety precautions applicable to a road test. |
–
| Then carry out vehicle system test again and rectify any faults which have occurred. |
|
|
|