t
| Ensure that the O-rings sit correctly into the corresponding tubes or grooves. |
t
| Cover all open junctions. |
t
| Keep reservoir closed as long as possible; only remove caps immediately prior to installation (reservoir contains a desiccant bag which soon becomes saturated with moisture and thus unusable when reservoir is open). |
|
|
|