seat Workshop Repair Guides

SEAT Workshop Service and Repair Manuals

Checking throttle valve positioner > < Test sequence
Checking commencement of injection valveN108
Checking commencement of injection valve -N108-
   
–  Separate 10-pin connector -arrow- for commencement of injection valve (connection to injection pump metering control).
  E10-0001
–  Measure resistance between connector contacts 9+10. Specification: 12 ... 20 Ω
If the specification is not attained:
–  Renew commencement of injection valve -N108- → Item.
If specification attained:
–  Remove wiper arms and cowl panel: → Electrical system; Rep. Gr.92
  A23-0027
–  Connect test box -V.A.G 1598/22- to control unit wiring harness.
  N24-0709
–  Check wiring for open circuit between test box and connector according to current flow diagram. Contact 9+ socket 79 Contact 10+ socket 2 Contact 10+ socket 28 Wire resistance: max. 1.5 Ω
–  Additionally check wires for short to one another, to vehicle earth and to battery positive. Specification: ∞Ω
If no wiring fault is detected:
–  Renew engine control unit → Chapter.
  A23-0028

Checking throttle valve positioner > < Test sequence