Welding in
- Make
- SEAT
- Model
- Mii
- Year
- 2011–2021
- Section
- Roof member: Renew › Welding in
Welding in
Note
- In the area of the A, B and C-pillars, high tensile, highest tensile and hot formed steels are used. The weld flanges in these areas are about 13 mm wide.
- If spot welds are located at the edge of thermally shaped panels, the high temperature will cause the bond between the panels to change in such a way that crash safety will be impaired.

Therefore, locate spot welds as close to the centre as possible.
- (a) of 8 mm can be achieved using angled welding tips.
Note
- New part must be welded in within 90 minutes or adhesion of adhesive will be impaired.
Apply 2K body adhesive D 180 KD3 A2 to front door aperture and to side window aperture, adhesive bead approx. 4 mm ∅.
Adapt roof side member to fit and fix in position.
Check fit with bolt-on parts.
Adapt roof side member to fit and fix in position.
Check fit with bolt-on parts.
Weld in parting cuts, MIG-L stepped seam or SG continuous weld seam are permitted.
Weld door apertures and side window aperture, RP spot weld seam (inverter).
Note
- If the roof has been renewed previously, heat protective paste is to be applied to the transition from roof to roof side member to prevent excessive heating of the roof adhesive.
Parts & tools for this job For 2011 SEAT Mii
- TOOLTrim removal tool kitSearch: trim removal tool kit
- PARTTouch-up paintSearch: SEAT touch up paint
- PARTPanel clip assortmentSearch: SEAT panel clips assortment
As an Amazon Associate we earn from qualifying purchases.