Weld together
- Make
- SEAT
- Model
- Toledo
- Year
- 5P, 2004–2009
- Section
- Parts breakdown › Weld together
Weld together

Place the new piece in its housing and carry out any necessary work to make sure the joint is well adjusted. Secure the piece with grips.
Weld sections (A) by cap welding the overlapping joint in a protective gas atmosphere.
Note
- If the lower C-pillar has not been removed, first the rear section (after cutting and with the initial openings) of the floor should be fitted, followed by the front section. In doing so, it is necessary to remove the bolts welded on the wheel housing first and then to re-weld them.

Weld the joints between the rear wheel housing and the rear sill by cap welding in a protective gas environment.

Spot weld the rest of the joints using the specified electrodes in the marked areas.
Apply sealing putty 0000980403, using the structural putty gun SAT 5380.
Apply Interior protection wax 0000980703.
Dimension overview for performing the boreholes

- 1 - b = 427mm Us the telescopic measurement rod VAS 5159
- 1 - c = 565 mm Us the telescopic measurement rod VAS 5159
- 1 - d = 1036 mm Us the large measurement rod SAT 5340
- 1 - e = 1030 mm Us the large measurement rod SAT 5340
- 1 - f = 964 mm Us the large measurement rod SAT 5340
- d - a = 910 mm Us the telescopic measurement rod VAS 5159
- 2 - a = 954 mm Us the large measurement rod SAT 5340
- 2 - b = 1030 mm Us the large measurement rod SAT 5340
- 2 - c = 1036 mm Us the large measurement rod SAT 5340
- 2 - d = 564 mm Us the telescopic measurement rod VAS 5159
- 2 - e = 426 mm Us the telescopic measurement rod VAS 5159
- c - f = 892,2 mm Us the telescopic measurement rod VAS 5159

Set the telescopic measurement rod VAS 5159 to a dimension of 427 mm and align to the opening of the floor (1) as well as the other end piece at position (b), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the large measurement rod SAT 5340 to a dimension of 1,030 mm and align to the opening of the floor (2) as well as the other end piece at position (b), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.

Set the telescopic measurement rod VAS 5159 to a dimension of 565 mm and align to the opening of the floor (1) as well as the other end piece at position (c), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the large measurement rod SAT 5340 to a dimension of 1,036 mm and align to the opening of the floor (2) as well as the other end piece at position (c), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.

Set the large measurement rod SAT 5340 to a dimension of 1,036 mm and align to the opening of the floor (1) as well as the other end piece at position (d), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the telescopic measurement rod VAS 5159 to a dimension of 564 mm and align to the opening of the floor (2) as well as the other end piece at position (d), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.

Set the large measurement rod SAT 5340 to a dimension of 1,030 mm and align to the opening of the floor (1) as well as the other end piece at position (e), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the telescopic measurement rod VAS 5159 to a dimension of 426 mm and align to the opening of the floor (2) as well as the other end piece at position (e), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.

Set the large measurement rod SAT 5340 to a dimension of 964 mm and align to the opening of the floor (1) as well as the other end piece at position (f), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the telescopic measurement rod VAS 5159 to a dimension of 892 mm and align to the cutting point of dimension (c) as well as the other end piece at position (e), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.

Set the large measurement rod SAT 5340 to a dimension of 954 mm and align to the opening of the floor (2) as well as the other end piece at position (a), as displayed in the illustration, and apply a marking with a maximum size of 50 mm using a water resistant pen.
Set the telescopic measurement rod VAS 5159 to a dimension of 910 mm and align to the cutting point of dimension (d) as well as the other end piece at position (a), as displayed in the illustration, and apply a marking to the cutting point using a water resistant pen.
Using a 6 mm drill bit, drill a hole at the dimensions of the luggage compartment floor (a), (b), (c), (d), (e) and (f).
Enlarge the diameter of the 6 boreholes with a 9 mm drill bit.

Enlarge the diameter of the boreholes of dimensions (c) and (d) using the 32 mm milling cutter (1).

Insert the fitting piece (1) in the boreholes (c) and (d) and perform two boreholes each using a 5 mm drill tip.

Remove the fitting piece (1).
Apply cavity preservative D.330.KD2.A1 to all boreholes.
Using the gun, apply single component assembly adhesive D.190.MKD.A3 to the circumference of the borehole (c) and (d) with a diameter of 32 mm.

Position the fitting pieces on the boreholes (c) and (d), each with 2 screws.
Parts & tools for this job For 2004 SEAT Toledo
- TOOLTrim removal tool kitSearch: trim removal tool kit
- PARTTouch-up paintSearch: SEAT touch up paint
- PARTPanel clip assortmentSearch: SEAT panel clips assortment
As an Amazon Associate we earn from qualifying purchases.