Installation
- Make
- SEAT
- Model
- Toledo
- Year
- KG, 2012–2019
- Section
- Running gear, axles, steering › Installation
Installation
Warning
After fitting the steering box mechanism, check the position of the steering wheel after a test drive.
Note
- When tightening the pressure pipe and the return lines, ensure that they do not rest on anything and that there is no friction.
- New steering boxes are delivered complete with the steering bars and track bar ball joints.
- Chapter “Determining centre position of steering rack”.
- New steering boxes are delivered with the steering rack centred.
- The cross member of the steering column must be fitted in the shaft of the steering box only when the vehicle is on the ground and the wheels are straight.
Check the centering of the steering box steering rack and adjust it if necessary Chapter “Determining centre position of steering rack”.
Fit the steering box from behind, inserting it by the centre first the right hand side and then the left hand side.
Fit the addition rubber so that the groove is towards the rear and the securing clamp towards the steering box.
Screw in the hexagonal bolts by hand to secure the steering box to the subframe.
Ensure the correct seating of the steering box.
Take off the plugs from the pipe connections on the power steering box and remove the plastic bag covering the lines.
Screw in the return line (1) and tighten.

Tightening torque: 30 Nm.
Screw in the pressure pipe (1) and tighten.

Tightening torque: 40 Nm.
Note
- Fit all new joints, do not re-use used ones.
Raise the subframe until it rests on the bodywork.
Fix the subframe to the bodywork. When doing so, only unscrew one securing bolt and replace it with a new one. The same is done for all 4 attachment points. Tighten the nuts.
Tightening torque: 70 Nm + 1/4 turn (90º)
Screw in the hexagonal bolts by hand (arrows) to secure the steering box to the subframe.
Tightening torque: 50 Nm + 1/4 turn (90º)
Fit the pendulum support to the gearbox so that the distance between the gearbox and the strut is a maximum.

Tighten the bolts for the pendulum support.
Tightening torque: 30 Nm + 1/4 turn (90º)
Fit the front exhaust tube with the catalytic converter Exhaust system.
Push in the joint of the track rods. In doing so, lock the joint (A) using a 6 mm Allen key and apply the new nut (B).

Tightening torque: 20 Nm + 1/4 turn (90º)
Insert the link bars (3), left and right to the stabiliser bar (2) and tighten using a new nut (1).

Tightening torque: 40 Nm.
Remove soundproofing Bodywork, front part.
Fit the front wheels and tighten the bolts.
Tightening torque: 120 Nm.
Place the vehicle on the ground so that it is supported on the wheels in a straight position.
Insert the cross member of the steering column in the shaft of the steering box.

Screw in the hexagonal bolt of the cross member (1).
Tightening torque: 20 Nm + 1/4 turn (90º)
Fit the cover (2) and tighten the plastic nuts (1).

Fill and bleed air from the power steering system Chapter “Power steering system: bleeding”
Following the installation of the power steering box, perform an axle alignment Chapter “Wheel alignment”.
Check the position of the steering wheel during a test drive.

Remove the adhesive tape securing the steering wheel (arrow).
Parts & tools for this job For 2012 SEAT Toledo
- TOOLTie rod end toolSearch: tie rod end puller
- TOOLBall joint separatorSearch: ball joint separator
- FLUIDPower steering fluidSearch: SEAT power steering fluid
As an Amazon Associate we earn from qualifying purchases.