Summary of components trailer coupling |
1 - | Trailer coupling frame |
–
| Remove trailer arm -4-. |
–
| Insert the blind plug -3- in the trailer arm hole. |
–
| Remove power socket -7-. |
Installation is carried out in the reverse order. |
Note The trailer couplings manufactured by PEKA and by PROF-SVAR are removed and installed in the same way as there are only minor differences in shape and function of the components. |
2 - | Bolt with spring washer, 80 Nm |
Insert in trailer arm hole. |
–
| Open lock on trailer arm hole. |
–
| Insert the blind plug -3- in the trailer arm hole. |
Installation is carried out in the reverse order. |
–
| Disconnect electrical installation. |
Installation is carried out in the reverse order. |
Note Use the type of power socket and the electric installation according to the relevant national legislation. |
10 - | Grommet for electric installation |
|
|
|