l
| Approved tyre size fitted to all wheels; tyres inflated to the specified pressure. |
l
| Mechanical/hydraulic part of the brake system together with the brake light switch and brake lights operating properly. |
l
| No leaks in hydraulic connections and lines (visual inspection of hydraulic unit, brake calipers, wheel brake cylinders, tandem brake master cylinder). |
l
| Wheel bearings and wheel bearing play O.K. |
l
| Control unit correctly bolted to the hydraulic unit. |
l
| Plug connection on control unit -J104- correctly plugged in (lock is engaged). |
l
| Inspect plug contacts of ABS components for damage and correct fitting. |
l
| All fuses according to current flow diagram O.K (to check remove fuses from the fuse holder). |
l
| Supply voltage O.K. (minimum 10.0 V). |
|
|
|