Octavia Mk1
Display group 032, lambda control - lambda learned values |
Engine idling |
Coolant temperature ≥ 80 °C |
Reading measured value block 32 | → | [lt ] Readout on display | |||||
xx.x % | xx.x % | ||||||
1 | 2 | 3 | 4 | [lt ] Display field | Specification | Analysis | |
no display | --- | ||||||
no display | --- | ||||||
Lambda learned value at part load (multiplicative) | -10,0…10,0 % | → Chapter | |||||
Lambda learned value at idling speed (additive) | -14,0…14,0 % | → Chapter |

t | to the display fields 1 and 2: |
t | Low readouts indicate that the engine is running too rich and the lambda control therefore produces a leaner mixture. |
t | High readouts mean that the engine is running too lean and the lambda control therefore produces a richer mixture. |
t | add = additive - The effect of the fault (e.g. unmetered air) becomes increasingly less as engine speed rises. In the case of an additive initialisation value the injection period is changed by a fixed rate. This rate is independent of the basic injection period. |
t | mul = multiplicative - The effect of the fault (e.g. faulty injector) becomes greater as engine speed rises. The multiplicative learned value is a percentage change in the injection period. This change is dependent on the basic injection period. |