–
| Carefully pull the old gasket ring -arrow- which is now visible out of its slot using a suitable tool, cut open and remove. |
Note While doing so, do not scratch the sealing surfaces. |
–
| First of all, place the new gasket ring behind the fuel shut-off valve -N109- and then carefully pull it over the distributor head and let it roll into the groove. |
WARNING The subsequent tightening of the fixing screws of the distributor head must absolutely be carried out in very small steps, otherwise the distributor head may tilt within the injection pump. In this case, the renewed gasket ring is immediately damaged and leaking. |
|
–
| Screw in the fixing screws of the distributor head by hand and carefully screw back the distributor head crosswise in the fitting position on the injection pump housing in very small steps. |
–
| Tighten the fixing screws of the distributor head to 12 Nm. |
–
| Retaining bracket and the cable to the fuel shut-off valve -N109- incl. Install bracket again. |
|
|
|