–
| Loosen both fixing screws -C- (2 Nm), if necessary, loosen all screwed connections -D-. |
–
| Pull out the relay and the control units then unclip the relevant relay carrier. |
–
| Remove relay holder -B- and additional relay holder -A- downwards. |
–
| Carry out the installation in the same way in reverse order. |
Note
|
|
|