XT-6 2WD L6-2.7L SOHC (1989)
-
Install belt tension adjuster.
Tightening torque: 23 - 26 Nm (2.3 - 2.7 kg-m, 17 - 20 ft-lb)
2.Install plug rubber.
3. Install idler pulley.
Tightening torque: 39 - 47 Nm (4.0 - 4.8 kg-m, 29 - 35 ft-lb)
4. Install crankshaft sprocket No.2 to crankshaft.
Note: Sprocket No.2 can be identified by the absence of dowel pin.
5. Install timing belt LH.