suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Fluid Pan, A/T|Specifications|Page 12230 > < Fluid Pan, A/T|Specifications
Page 1
background image

Fluid Pan: Service and Repair

Control Valve Body Cover Replacement

Removal Procedure

1. Raise the vehicle. 
2. Remove the left front wheel and tire assembly. 
3. Remove the left and right splash shield. 
4. Remove the front engine mount. 
5. Remove the transaxle oil cooler lines and seals from the transaxle. 

6. Remove the 9 TORX bolts (2) from the control valve body cover (1).

NOTE: 
Do not pry with a tool on the transaxle control valve body cover, case or sealing surfaces.

7. Remove control valve body cover.

Installation Procedure

1. Clean any gasket material from the control valve body cover and inspect the gasket mounting surface.
2. Install a 3 mm (0.125 in) bead of RTV sealer GM P/N 89020326 (Canadian P/N 89021188) onto the control valve body cover.

Fluid Pan, A/T|Specifications|Page 12230 > < Fluid Pan, A/T|Specifications