4 Runner 2WD V6-4.0L (1GR-FE) (2006)
Shift Interlock Solenoid: Testing and Inspection
INSPECTION
1. INSPECT KEY INTERLOCK SOLENOID
a. Disconnect the solenoid connector.
b. Connect KLS+ (4) terminal to the batteries positive (+) terminal, and KLS- (3) terminal to the battery negative H terminal, and apply about
12V between KLS+ and KLS- terminals.
Check that operation noise can be heard from the solenoid.
If the solenoid does not operate, replace the solenoid.