4 Runner 4WD L4-2366cc 2.4L SOHC Turbo (22R-TE) (1987)
2. ADJUST PRELOAD
(a) Using SST, torque the adjusting nut - SST 09607-60020
Torque: 600 kg-cm (43 ft-lb, 59 N.m)
(b) Turn the hub right and left two or three times.
(c) Using SST, loosen the adjusting nut until it can be turned by hand - SST 09607-60020
(d) Using SST, retighten the adjusting nut - SST 09607-60020
Torque: 150 kg-cm (11 ft-lb, 15 N.m)
(e) Using a spring tension gauge, check the preload.
Preload (starting): 2.1 - 3.6 kg (4.6 - 7.9 lb, 21 - 35 N.m)
3. INSTALL BRAKE ASSEMBLY
(a) Tighten the adjusting nut by the smallest amount possible and align it in either position shown left.
(b) Align the brake hub with the spindle groove and insert until it is up against the adjusting nut. A Then confirm that the holes of the brake hub
and adjusting nut are aligned.
(c) Using a spring tension gauge, check the preload.
Preload (starting): 2.1 - 3.6 kg (4.6-7.9 lb, 21 - 35 N.m)
-
If not within specification, adjust with the adjusting nut.