4 Runner 4WD V6-4.0L (1GR-FE) (2006)
7
Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing caps as shown in the illustration.
12. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
13. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
14. INSTALL IGNITION COIL ASSEMBLY
Torque: 10 Nm (102 kgf-cm, 7 ft. lbs.)
15. INSTALL INTAKE AIR SURGE TANK
16. INSTALL AIR CLEANER ASSEMBLY
17. CONNECT VENTILATION HOSE NO.2
18. ADD ENGINE COOLANT
19. CHECK FOR ENGINE COOLANT LEAKS
20. INSTALL V-BANK COVER
a. Install the V-bank cover with the 2 nuts.
Torque: 7.5 Nm (76 kgf-cm, 66 inch lbs.)
21. INSPECT IGNITION TIMING
SST 09843-18040