toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Door Lock Relay|Locations|Page 18 > < Power Door Lock Relay|Locations
Page 1
background image

Power Door Lock Relay: Testing and Inspection

Power Door Lock Control System Location

INSPECT INTEGRATION RELAY OPERATION

Integration Relay Operation

Door Lock Signal:

HINT:  When the relay circuit is as specified, inspect the door lock signal.

1. Connect the positive (+) lead from the voltmeter to terminal 14 and the negative (-) lead to terminal 15.
2. Set the door lock control switch to UNLOCK and check that the voltage rises from 0 V to battery positive voltage for approximately 0.2 seconds.

Integration Relay Operation

3. Reverse the polarity of the voltmeter leads.
4. Set the door lock control switch to LOCK and check that the voltage rises from 0 V to battery positive voltage for approximately 0.2 seconds.

If operation is not as specified, replace the relay.

Power Door Lock Relay|Locations|Page 18 > < Power Door Lock Relay|Locations