Avalon V6-3.5L (2GR-FE) (2006)
![background image](/toyota/avalon/v6-3.5l_(2gr-fe)/Page-910010.png)
e. Install the indicator light wire to the position indicator housing upper.
NOTICE: Make sure that the indicator light wire is securely installed to the position indicator housing upper.
23. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
a. Install the floor shift assembly with the 4 bolts.
Torque: 12 Nm (122 kgf-cm, 9 ft. lbs.)
b. Connect the 2 connectors and clamp to the floor shift assembly.
24. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
a. Connect the transmission control cable assembly to the transmission floor shift assembly.
HINT:
-
Install it with the uneven surface facing up.
-
Securely engage the claws.
25. INSTALL CONSOLE BOX FRONT
26. INSTALL CONSOLE BOX ASSEMBLY
27. INSTALL CONSOLE PANEL SUB-ASSEMBLY UPPER
28. INSTALL CONSOLE BOX UPPER