Camry L4-2.4L (2AZ-FXE) Hybrid (2007)
(d) Engage the 4 claws and install the control panel case.
2. INSTALL AIR CONDITIONING PANEL SUB-ASSEMBLY
(a) Engage the 4 claws and install the ornament.
(b) Engage the 4 claws.
(c) Install the air conditioning panel sub-assembly with the 5 screws.