toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 4827 > < Initial Inspection and Diagnostic Overview|Page 4825
Page 68
background image

INSPECTION PROCEDURE

NOTICE:
-

Turn the power switch off before measuring the resistances of the CAN bus main wires and CAN bus branch wires.

-

After the power switch is turned off, check that the key reminder warning system and lighting system are not operating.

-

Before measuring the resistance, leave the vehicle as is for at least 1 minute and do not operate the power switch, any other switches, or the
doors. If any doors need to be opened in order to check connectors, open the doors and leave them open.

HINT:  Operating the power switch, any other switches, or a door triggers related ECU and sensor communication on the CAN. This
communication will cause the resistance value to change.

PROCEDURE

1. CHECK FOR OPEN IN CAN BUS WIRE (SKID CONTROL ECU BRANCH WIRE)

(a) Turn the ignition switch off.

(b) Disconnect the skid control ECU connector.
(c) Measure the resistance according to the value(s) in the table below.

Standard resistance:

Initial Inspection and Diagnostic Overview|Page 4827 > < Initial Inspection and Diagnostic Overview|Page 4825