toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Door Lock Actuator|Locations|Page 4080 > < Power Door Lock Actuator|Locations
Page 1
background image

Power Door Lock Actuator: Testing and Inspection

INSPECTION OF DOOR LOCK SOLENOID

INSPECT SOLENOID OPERATION 

(Front and Rear door)

(a)  Connect the positive (+) lead from the battery to terminal 4 and negative (-) lead to terminal 3, checkthat the solenoid operation in the lock

(Pull) direction.

(b) Check that there is no continuity between terminals 1 and 2.

(c)  Connect the positive (+) lead from the batterv to terminal 3 and negative (-) lead to terminal 4, checkthat the solenoid operation in the unlock

(Push) direction.

(d) Check that there is continuity between terminals 1 and 2.

If operation is not as specified, replace the solenoid.

(Back door)

(a)  Connect the positive (+) lead from the battery to terminal 2 and negative () lead to terminal 4, check that the solenoid operation in the lock

(Pull) direction.

(b) Check that there is no continuity between terminals 1 and 3.

(c)  Connect the positive (+) lead from the battery to terminal 4 and negative (-) lead to terminal 2, check that the solenoid operation in the unlock

(Push) direction.

(d) Check that there is continuity between terminals 1 and 3.

Power Door Lock Actuator|Locations|Page 4080 > < Power Door Lock Actuator|Locations