toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Fuel Injector|Removal|Page 1924 > < Fuel Injector|Removal|Page 1922
Page 3
background image

9. INSTALL NO.1 ENGINE HANGER AND AIR INTAKE CHAMBER STAY.

a. Connect the air intake chamber stay with the bolt.

Torque:  380 kg-cm (27 ft-lb,37 N.m)

b. Install the no.1 engine hanger with the two bolts.

Torque:  380 kg-cm (27 ft-lb, 37 N.m)

10. CONNECT FOLLOWING HOSES AND PARTS:

a. Wire harness clamp.

Connect the wire harness clamp with the nut.

b. Brake booster vacuum hose.
c. PS vacuum and air hoses.
d. Cruise control vacuum hose.
e. Ground strap connector.

11. CONNECT COLD START INJECTOR TUBE.

12. CONNECT COLD START INJECTOR CONNECTOR.

13. INSTALL NO.1 ENGINE RH MOUNTING STAY.

Install the No.1 engine RH mounting stay with the three bolts.

Torque:  530 kg-cm (38 ft-lb, 52 N.m)

Fuel Injector|Removal|Page 1924 > < Fuel Injector|Removal|Page 1922