Celica L4-1.8L (2ZZ-GE) (2005)
g. Install the center brace with the 2 bolts.
h. Install the hood lock with the 3 bolts.
i.
Connect the 2 A/T oil cooler hoses.
j.
Connect the lower radiator hose.
k. Connect the upper radiator hose.
l.
Connect the No. 1 electric cooling fan connector.
m. Connect the No. 2 electric cooling fan connector.
3. INSTALL ENGINE COOLANT RESERVOIR
a. Install the engine coolant reservoir with the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.)
b. Connect the 3 radiator reservoir hoses.
4. INSTALL AIR CLEANER
5. 2ZZ-GE: INSTALL AIR PUMP ASSEMBLY
6. INSTALL BUMPER COVER
7. FILL WITH ENGINE COOLANT
8. INSTALL UPPER FRONT FENDER APRON SEAL AND UPPER RADIATOR SUPPORT SEAL
9. START ENGINE AND CHECK FOR COOLANT LEAKS