Celica L4-1.8L (2ZZ-GE) (2005)
c. Push down on the rear side of the compressor and fully tighten bolt B, bolt C and bolt A in order.
Torque: 25 Nm (250 kgf-cm, 18 ft-lbf)
d. Connect the compressor connector.
2. CONNECT DISCHARGE AND SUCTION HOSES
a. Lubricate 2 new O-rings with compressor oil and install them to the hoses.
b. Connect the both hoses with 2 bolts.
Torque: 10 N.m (100 kgf.cm, 7 ft.lbf)
NOTE: Hose should be connected immediately after the caps have been removed.
3. 1ZZ-FE: INSTALL CRUISE CONTROL ACTUATOR
4. 2ZZ-GE: INSTALL AIR PUMP ASSEMBLY
5. INSTALL AND CHECK DRIVE BELT
6. CONNECT NEGATIVE (-) TERMINAL CABLE TO BATTERY
7. EVACUATE AIR FROM REFRIGERATION SYSTEM CHARGE SYSTEM WITH REFRIGERANT
Specified amount: 430 ± 30 g (15.17 ± 1.06 oz.)
8. INSPECT FOR LEAKAGE OF REFRIGERANT
Using a gas leak detector, check for leakage of refrigerant.
If there is leakage, check the tightening torque at the joints.
9. INSPECT A/C OPERATION