Celica GT-S L4-1.8L (2ZZ-GE) (2000)
Starter Relay: Testing and Inspection
INSPECTION
1. REMOVE STARTER RELAY
2. INSPECT STARTER RELAY CONTINUITY
a. Using an ohmmeter, check that there is continuity between terminals 1 and 2.
If there is no continuity, replace the relay.
b. Check that there is no continuity between terminals 3 and 5.
If there is continuity, replace the relay.
3. INSPECT STARTER RELAY OPERATION
a. Apply battery positive voltage across terminals 1 and 2.
b. Using an ohmmeter, check that there is continuity between terminals 3 and 5.
If there is continuity, replace the relay.
4. REINSTALL STARTER RELAY