Celica GT Liftback L4-2164cc 2.2L DOHC (5S-FE) MFI (1999)
b. Attach a new gasket to the intake manifold, facing the protrusion downward.
1. Type A:
Install the throttle body with the 4 bolts.
Torque: 19 Nm (195 kgf.cm, 14 ft.lbf)
HINT: Different bolt lengths are used for the upper and lower sides. Bolt length:
Upper side 45 mm (1.77 in.)
Lower side 55 mm (2.17 in.)
2. Type B;
Install the throttle body with the 2 bolts and 2 nuts.
Torque: 19 Nm (195 kgf.cm, 14 ft. lbf)
c. Connect these hoses;
-
Vacuum hose (from upper port of TVV for EVAP) to port "P" of throttle body
-
Vacuum hose (from port "Q" of EGR vacuum modulator) to port "E" of throttle body
-
Vacuum hose (from port "R" of EGR vacuum modulator) to port "R" of throttle body
d. Connect these connectors;
-
Throttle position sensor connector
-
IAC valve connector
2. CONNECT CONTROL CABLES TO THROTTLE BODY
Connect these cables;
-
Accelerator cable
-
A/T throttle control cable
3. INSTALL AIR CLEANER CAP
4. FILL WITH ENGINE COOLANT