Celica GT Liftback L4-2164cc 2.2L DOHC (5S-FE) MFI (1999)
![background image](/toyota/celica_gt_liftback/l4-2164cc_2.2l_dohc_(5s-fe)_mfi/Page-1311002.png)
11. DISCONNECT RH AND LH LOWER SUSPENSION ARMS
12. DISCONNECT 2 ENGINE MOUNTINGS
a. Front side:
Remove the bolt and nut.
b. Rear side:
Remove the bolt.
13. REMOVE FRONT SUB-FRAME WITH PS GEAR ASSEMBLY
14. REMOVE PS GEAR ASSEMBLY
Remove 2 gear assembly set bolts and nuts from the front subframe.
INSTALLATION
1. INSTALL PS GEAR ASSEMBLY
a. Install the gear assembly to the front sub-frame.
b. Torque the 2 gear assembly set bolts and nuts.
Torque: 127 Nm (1,300 kgf-cm, 94 ft. lbs.)
2. INSTALL FRONT SUB-FRAME WITH PS GEAR ASSEMBLY
3. CONNECT 2 ENGINE MOUNTINGS
a. Front side:
Torque the bolt and nut.
Torque: 88 Nm (890 kgf-cm, 64 ft. lbs.)
b. Rear side:
Torque the bolt.
Torque: 88 Nm (890 kgf-cm, 64 ft. lbs.)
4. CONNECT RH AND LH LOWER SUSPENSION ARMS
5. CONNECT PRESSURE FEED AND RETURN TUBES
Using SST, connect the tube.