toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Torque Converter Bolt Installation Precautions|Page 3705 > < A/T - Torque Converter Bolt Installation Precautions|Page 3703
Page 1
background image

Torque Converter: Testing and Inspection

INSPECTION 

1. INSPECT ONE-WAY CLUTCH

a. Install SST into the inner race of the one-way clutch.

SST 09350-32014 (09351-32010)

b. Install SST so that it fits in the notch of the converter hub and outer race of the one-way clutch.

SST 09350-32014 (09351-32020)

c. With the torque converter clutch standing on its side, check the clutch locks when turned counterclockwise, and rotates freely and smoothly

clockwise. 
If necessary, clean the converter and retest the clutch. Replace the converter clutch if the clutch still fails the test.

2. MEASURE DRIVE PLATE RUNOUT AND INSPECT RING GEAR

Set up a dial indicator and measure the drive plate runout.
Maximum runout: 0.20 mm (0.0079 inch) 
If the runout is not within the specification or if the ring gear is damaged, replace the drive plate. If installing a new drive plate, note the
orientation of spacers and tighten the bolts.
Torque: 83 Nm (850 kgf-cm, 61 ft. lbs.) 

3. MEASURE TORQUE CONVERTER CLUTCH SLEEVE RUNOUT

Temporarily mount the torque converter clutch to the drive plate.
Set up a dial indicator and measure the torque converter clutch sleeve runout.
Maximum runout: 0.30 mm (0.0118 inch) 
If the runout is not within the specification, try to correct by reorienting the installation of the torque converter clutch. If excessive runout cannot

A/T - Torque Converter Bolt Installation Precautions|Page 3705 > < A/T - Torque Converter Bolt Installation Precautions|Page 3703