toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Belt Removal|Page 565 > < Timing Belt Removal|Page 563
Page 3
background image

a. Install the No. 1 idler pulley and finger tighten the pulley mount bolt.
b. Install the pulley guide bolt, then torque the bolt to 7.4 Nm (65 in lb). Check that the idler pulley bracket can be moved to the left and right by

hand.

Installing Camshaft Timing Pulley

6.

Install the camshaft timing pulley.
a. Align the camshaft knock pin with the camshaft timing pulley and install the timing pulley.
b. Using SST 09278-54011 or equivalent, install and torque the mount bolt with the plate washer. Torque the bolt to 98 Nm (72 ft lb).

7.

Install timing belt.

CAUTION: The engine should be cold.

Installing Timing Belt

a. Align the line mark of the camshaft timing pulley with the top end of the cylinder head.

NOTE: Do not align the cylinder head cover with the boss.

b. Align the grooves of the crankshaft timing pulley and oil pump.
c. Align the cavity of the injection pump drive pulley with the line mark on the water pump.

NOTE: Secure the injection pump drive pulley in place until the timing belt is installed because the drive pulley will not come on rest by itself at the

matchmark position.

d. Install the timing belt to the camshaft timing pulley.

NOTE: Install a new belt so the numbers and letters can be read from the rear end of the engine.

Timing Belt Removal|Page 565 > < Timing Belt Removal|Page 563