toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Generator <--> [Alternator]|Removal and Installation|Page 5771 > < Generator <--> [Alternator]|Removal and Installation|Page 5769
Page 5
background image

d. Mount SST (C) in a vise.
e. Insert SST (B) into SST (C), and attach the pulley nut to SST (C).

f.

To torque the pulley nut, turn SST (A) in the direction shown in the illustration.
Torque: 110.5 N.m (1,125 kgf.cm, 81 ft.lbf)

g. Remove the generator from SST (C).

h. Turn SST (B), and remove SST (A and B).

4. INSTALL RECTIFIER HOLDER

a. Install the 4 rubber insulators on the lead wires.

NOTE:  Be careful of the rubber insulators installation direction.

Generator <--> [Alternator]|Removal and Installation|Page 5771 > < Generator <--> [Alternator]|Removal and Installation|Page 5769