Cressida L6-2759cc 5M Ser (1984)
![background image](/toyota/cressida/l6-2759cc_5m_ser/Page-233001.png)
Cold Start Injector Time Switch: Testing and Inspection
Fig. 36 Testing Start Time Switch
5M-GE ENGINES
1.
Disconnect electrical connector to switch and measure resistance between switch terminals Fig. 36.
2.
Resistance should be 30 - 50 ohms below 95 degrees F and 70 - 90 ohms above 95 degrees F.
3.
Measure resistance between STA (B+) terminal and ground. Resistance should be 30 - 90 ohms.
4.
If resistance is not within specifications, switch is defective.