Cressida L6-3.0L DOHC (7M-GE) (1989)
![background image](/toyota/cressida/l6-3.0l_dohc_(7m-ge)/Page-638004.png)
16. Connect the inlet fuel tube to the fuel filter and torque union bolt to 22 ft.lbs. (29 N-m).
17. Torque No.1 union bolt to the fuel rail to 29 ft.lbs. (39 N-m), if using copper gaskets and 23 ft.lbs. (31 N-m), if using tin plated gaskets.
18. Connect the cold start injector fuel pipe to the Cold Start Injector and the fuel rail. If copper gaskets are used, torque the Cold Start Injector union
bolt to 13 ft.lbs. (18 N-m) or if tin plated gaskets are used, torque to 8 ft.lbs. (11 N-m). DO NOT overtighten the union bolts.
19. Torque the fuel rail union bolt to 22 ft.lbs. (29 N-m), if using copper gaskets and 23 ft.lbs. (31 N-m), if using tin plated gaskets.
20. Connect injector connectors.
21. Install ISC Valve on intake plenum.
22. Install Throttle Body on intake plenum. Refer to THROTTLE BODY for proper procedure.
23. Reconnect the negative battery terminal.
24. Start engine and check for fuel leaks.