Cressida L6-3.0L DOHC (7M-GE) (1989)
Starter Relay: Testing and Inspection
Starter Relay Testing
CONTINUITY
1.
Check that there is continuity between terminals 1 and 3.
2.
Check that there is no continuity between terminals 2 and 4.
3.
If not as specified, replace relay.
OPERATION
1.
Apply battery voltage across terminals 1 and 3.
2.
Check that there is continuity between terminals 2 and 4.
3.
If not as specified, replace relay.