toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

With Manual Steering|Page 3286 > < With Manual Steering|Page 3284
Page 6
background image

b. Connect the tube clamp with the bolt. 

Torque: 7.8 Nm (80 kgf.cm, 69 inch lbs.)

9. CONNECT PRESSURE FEED AND RETURN TUBES

a. Using SST, connect the pressure feed and return tubes.

SST 09023-12900
Torque: 32 Nm (325 kgf.cm, 24 ft. lbs.)

HINT:  Use a torque wrench with a fulcrum length of 300 mm (11.81 inch). This torque value is effective in case that SST is parallel to a
torque wrench.

b. Connect the return hose with the clip.
c. Connect the column hole cover sub-assembly.

10. CONNECT SLIDING YOKE
11. INSTALL NO. 2 COLUMN HOLE COVER
12. CONNECT RIGHT-HAND AND LEFT-HAND TIE ROD ENDS
13. INSTALL RIGHT-HAND AND LEFT-HAND ENGINE UNDER COVERS
14. PLACE FRONT WHEELS FACING STRAIGHT AHEAD 

HINT:  Do it with the front of the vehicle jacked up.

15. CENTER SPIRAL CABLE
16. INSTALL STEERING WHEEL

a. Align the matchmarks on the steering wheel and steering column main shaft.
b. Temporarily tighten the steering wheel set nut.

17. BLEED POWER STEERING SYSTEM
18. CHECK STEERING WHEEL CENTER POINT
19. TORQUE STEERING WHEEL SET NUT

Torque: 34 Nm (350 kgf.cm, 25 ft. lbs.)

20. INSTALL STEERING WHEEL PAD
21. CHECK FRONT WHEEL ALIGNMENT

Disassembly and Reassembly

With Manual Steering|Page 3286 > < With Manual Steering|Page 3284