FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
(d) Using a pin punch and hammer, install a new pin onto the master cylinder reservoir.
12. INSTALL BRAKE ACTUATOR NO. 1 BRACKET
(a) Install the fluid level warning switch connector.
(b) Using a 5 mm hexagon wrench, install the brake actuator bracket with the bolt.
Torque: 7.8 Nm (80 kgf-cm, 69 in-lbf)
Installation
BRAKE: HYDRAULIC BRAKE BOOSTER: INSTALLATION
INSTALLATION
1. INSTALL HYDRAULIC BRAKE BOOSTER
(a) Install a new gasket onto the hydraulic brake booster.
(b) Install the hydraulic brake booster with the 4 nuts.
Torque: 14 Nm (145 kgf-cm, 10 ft-lbf)
(c) Temporarily install each brake tube to the correct positions of the brake actuator as shown in the illustration.
(d) Using a union nut wrench, connect the 4 brake tubes onto the hydraulic brake booster.
without union nut wrench - Torque: 15 Nm (155 kgf-cm, 11 ft-lbf)
with union nut wrench - Torque: 14 Nm (144 kgf-cm, 10 ft-lbf)
-
This torque value can be obtained by using a torque wrench with a fulcrum length of 300 mm (11.8 in.) and a union nut wrench with a