FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
(1) Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.
16. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH See: Camshaft, Lifters and Push Rods/Camshaft/Service and Repair/Installation
17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY See: Camshaft, Lifters and Push Rods/Camshaft/Service and Repair/Installation
18. INSTALL IGNITION COIL ASSEMBLY See: Powertrain Management/Ignition System/Ignition Coil/Service and Repair/Installation
19. INSTALL INTAKE AIR SURGE TANK See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and
Repair/Installation
20. INSTALL NO. 2 SURGE TANK STAY See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and
Repair/Installation
21. INSTALL NO. 1 SURGE TANK STAY See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and
Repair/Installation
22. INSTALL OIL BAFFLE PLATE See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
23. INSTALL THROTTLE BODY BRACKET See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and
Repair/Installation
24. INSTALL AIR CLEANER ASSEMBLY See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and
Repair/Installation
25. ADD ENGINE COOLANT See: Cooling System/Coolant/Service and Repair
26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
27. CHECK FOR ENGINE COOLANT LEAKAGE See: Cooling System/Coolant/Service and Repair
28. INSPECT IGNITION TIMING See: Testing and Inspection/Engine
29. INSTALL V-BANK COVER See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation