FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
Variable Valve Timing Actuator: Service and Repair
Installation
1GR-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Install the 2 camshaft timing oil control valves with the 2 bolts.
Torque: 9.0 Nm (92 kgf-cm, 80 in-lbf)
(b) Connect the 2 connectors.
2. INSTALL INTAKE AIR SURGE TANK See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
3. INSTALL NO. 2 SURGE TANK STAY See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
4. INSTALL NO. 1 SURGE TANK STAY See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
5. INSTALL OIL BAFFLE PLATE See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
6. INSTALL THROTTLE BODY BRACKET See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation
7. INSTALL AIR CLEANER ASSEMBLY See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
9. ADD ENGINE COOLANT See: Engine, Cooling and Exhaust/Cooling System/Coolant/Service and Repair
10. CHECK FOR ENGINE COOLANT LEAK See: Engine, Cooling and Exhaust/Cooling System/Coolant/Service and Repair
11. INSTALL V-BANK COVER See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation