FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
Variable Valve Timing Actuator Position Sensor: Service and Repair
Installation
1GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
INSTALLATION
1. INSTALL VVT SENSOR
(a) Bank 2 side VVT sensor:
(1) Apply a light coat of engine oil to the O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
(4) Connect the No. 4 water by-pass hose and No. 5 water by-pass hose.
(b) Bank 1 side VVT sensor:
(1) Apply a light coat of engine oil to the O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
2. INSTALL AIR CLEANER ASSEMBLY See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
4. ADD ENGINE COOLANT See: Engine, Cooling and Exhaust/Cooling System/Coolant/Service and Repair
5. CHECK FOR ENGINE COOLANT LEAKAGE See: Engine, Cooling and Exhaust/Cooling System/Coolant/Service and Repair
6. INSTALL V-BANK COVER See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation